Phases
  1. The cabin was leveled. The Corners of the foundation were put in place. We used sand stone replacing the original foundation which was made up of small creek stones.
  2. The height of the cabin was raised by three logs.
  3. Windows were added to the second floor. Their location was determined by the available length of logs. We were able to use a short timber on either side of the window.
  4. The windows and doors were framed out with treated pine. The original doors will be reinstalled over the treated pine.