Notice the reuse of the pole rafters on top of the plate and the original grey door.
Phases
- The cabin was leveled. The Corners of the foundation were put in place. We used sand stone replacing the original foundation which was made up of small creek stones.
- The height of the cabin was raised by three logs.
- Windows were added to the second floor. Their location was determined by the available length of logs. We were able to use a short timber on either side of the window.
- The windows and doors were framed out with treated pine. The original doors will be reinstalled over the treated pine.


Aw. It looks so itty bitty now.